• 008613758576429
  • zkf_88@163.com

ESP Upgradation and Boiler Renovation


Renovation Project including engineering, design, manufacture, supply, erection, commissioning and handover for Providing energy saving and emission reduction solution of power plant, metallurgical, cement industry, etc

A. ESP Renovation of adding field for emission update to 30mg/Nm3.

图片1

B. ESP emission up-gradation for 30mg/Nm3 and below.

(Solution-1. hybrid system)

图片2

C. ESP Emission upgradation

(Solution-2, Replace the existing TR and Controller by HF TR-high frequence TR)

图片3

D. Boiler, Turbine & Generator Renovation For Efficiency Improvement and Energy Saving.

a. Boiler energy saving renovation.

图片4_副本

b. Turbine renovation for performance improvement.

图片6

c. Generator rewiring

图片7